McCormack Construction's Core Values:
| Be Respectful | Do The Right Thing | Can Do Attitude | Open & Honest |
Learn More >>
Alex Doherty
Project Engineer
Bio
Alex is currently a Project Engineer and has served this company in the positions of Laborer and Carpenter. Alex has the important role of scheduling procurement and reviewing submittals, daily logs, and time sheets. He is also responsible for maintaining contact between sub-contractors and providing important information and details.
Alex has over 6 years of construction experience, where he has acquired the knowledge and skills to advance his role quickly and consistently provide exceptional results. He is a strong multitasking individual who thrives in a fast-paced, dynamic environment. Alex has worked on many multi-million-dollar projects. During this time, he has honed his skills to be a solid teammate and a strong leader. He has excellent knowledge of computer applications, including spreadsheet databases and word-processing programs. Alex is very articulate, with the ability to read and interpret blueprints and present information to others.
In his spare time, he enjoys all seasonal hobbies ranging from hunting, fishing, snowboarding, traveling, and festivities with family and friends.
Associated Projects
2017-2018
Eastern Oregon Telecom
Served at the project from start to finish. Operation of a diverse range of heavy-duty construction equipment. Installments of footings, stem walls, door frames, erecting walls, sheathing, site cleanliness, and tool organization.
2018-2019
Pendleton Fire Station
Started early stages of the project setting batter boards, building footings, laying and tying rebar, unloading and organizing material, shooting grade, and tool organization.
2018-2019
Northpowder School
Demolition of gypsum board and wall studs, carpet removal, operation of floor grinder, cutting and installation of walls, insulation, doors, and hardware.
2019
Hermiston Trucare
A full remodel and HVAC update of the Pendleton Oregon airport, he assisted with submittals, RFIs, sub coordination, material procurement, and assisted in putting out subcontracts.
2019
Round up Retail Store
Organized material, cut and erected pony walls, operation of roto-hammer, and installation of titans, blocking, and sheathing.
2019-2021
Stanfield School
Worked all phases of the project, building footings, stem walls, pouring concrete, erecting walls, adding blocking, backing, sheathing, door hardware, bathroom accessories, and skylights.
2021
Hermiston Chamber
Demolition of walls, carpet, and doors. Built and installed a Pergola as well as brick and paint repair.
2021
Pendleton Happy Canyon
Demolition of old bar top and soffit. Installation of the new bar top, siding, and trim.
2021
Pendleton Motostuff
Demolition of walls, carpet, tile, and concrete. Operation of a jackhammer and hot saw. Installation of joists, blocking, doors and hardware.
2021-2022
Pilot Rock School
Started project on Seismic phase doing demolition and improving structural on the gymnasium and high school. Set up batter boards, pulled measurements for CTE building, set footings, stem walls, poured concrete, built and erected walls, doors, windows, trusses, and fascia. Added backing for bathroom accessories and hardware. Removal and reinstallation of T&G Board in a high school office. Built and installed an additional bathroom in the concessions area at the elementary school. Installed Hardie Board siding, doors, grab bars, and other toiletry accessories.